Real results from
real operations.

From hospitals and manufacturing plants to military vessels and university campuses, these are the outcomes that matter. Documented results, named sources, measurable ROI.

30%+ Average maintenance cost reduction after TPS installation
<6 mo Typical payback period across documented installations
30 yr Unconditional free replacement warranty on TPS products
Power Protection Results

Protection that pays for itself.
Every time.

These results come from TPS installations across healthcare, manufacturing, military, retail, and education operations. As an authorized TPS dealer, we deploy the same technology and methodology documented here. Every quote is attributed. Every number is documented.

Payback Under 1 Year

“Reduced downtime of microprocessor equipment, clearer ultrasound images, more reliable x-ray computers, reduced circuit board replacement. No lightning damage whatsoever since installation.”

Director of Facilities Management
Florida Hospital East Orlando
Healthcare Read Full Case Study →
90% Savings

“Every installation was reported as 100% successful, virtually eliminating repair and downtime costs. Lighting panel test showed 90%+ savings with an estimated 6-month ROI.”

Mike Davis, President
Innovative Control Systems, Inc.
Sanford Health, Fargo ND
Healthcare Read Full Case Study →
<2 Month ROI

“Pre-installation losses were in the tens of millions of dollars per quarter. Only 2 units lost in 10 years, both from user error. Zero maintenance labor or parts expense over 10 years.”

Dale Pickering
Principal Electrical Engineer
Atmel Semiconductor, Colorado Springs
Manufacturing Read Full Case Study →
Zero Failures, 7 Years

“When I purchased the company, they tolerated at least $5,000 per year in equipment failure costs. After installing TPS, we had zero equipment failures due to power surges. When the transformer exploded, only one device was affected with zero downtime.”

Tom Miller, CEO
Western Industrial Tooling
Manufacturing Read Full Case Study →
53.6:1 ROI

“A great investment on any and all the systems and ships represented in this study. All ROI ratios were positive. Projected lifetime cost savings of $141 million across 23 ships.”

TYCOM-Level Study
United States Navy
Government / Military Read Full Case Study →
$20K/yr Eliminated

“In 23 years, numerous lightning strikes caused severe damage. Since installing TPS, we have experienced severe storms with no electronic failure of any kind. I should have installed the system twenty years ago.”

Jordy Anderson, President
T&T Shell Inc., Sarasota FL
Retail / Commercial Read Full Case Study →
$60K+ Per Storm

“The platform suffered devastating storms with $40,000 to $60,000+ in repair parts per event. After TPS installation, no downtime or damage to any protected systems across 2 years of storms.”

Howard C. Cooper, Chief Consultant
ExxonMobil Jade Platform, West Africa
Oil & Gas Read Full Case Study →
ROI Under 1 Year

“HVAC and lighting replacements were occurring too frequently. Most equipment replacement issues have gone away as a direct result of the surge suppression installation. The campus has already seen a return on its investment.”

Matt Butenhoff, Electrical Supervisor
Richard Stockton College of New Jersey
Education Read Full Case Study →
Protection typically costs less than a single equipment failure.

Payback documented in under 6 months, with protection that lasts 30 years. Find out where your operations stand.

Check Your Risk →
Why Pearl Snap

The results above come from TPS technology.
The relationship comes from us.

Pearl Snap Consulting is a veteran-owned firm with more than 20 years of experience across military operations, public safety, emergency management, and critical infrastructure. We bring the consulting perspective to every engagement. We help you understand your actual exposure before recommending a solution.

Strategic Consulting

Technology strategy for organizations
where it matters most.

Pearl Snap Consulting works with organizations navigating complex technology decisions, operational resilience challenges, and infrastructure modernization.

CUSEC
Central United States Earthquake Consortium
Multi-State Government

Pearl Snap Consulting delivered a strategic assessment of CUSEC's RVS (Rapid Visual Screening) project management system, serving earthquake preparedness coordination across multiple member states. The engagement included stakeholder analysis, current state documentation, and a complete Monday.com implementation plan with workflow automation, notification protocols, and cross-state data governance recommendations.

The project produced a current state assessment report, a Monday.com configuration guide and implementation roadmap, and executive-level strategic recommendations for system adoption and change management.

Current State Analysis Monday.com Implementation Workflow Automation Change Management FEMA P-154 Compliance
Monday.com Certified Partner Monday.com Certified Partner
Preppr.ai
Preparedness Innovations, Inc.
AI / Emergency Preparedness

Strategic consulting engagement for an AI-powered emergency preparedness platform, providing guidance on product strategy, market positioning, and operational frameworks for scaling a technology startup in the emergency management space.

Product Strategy Market Positioning Operational Frameworks
Colorado DHSEM
Division of Homeland Security & Emergency Management
State Government

Certified State of Colorado emergency management instructor, delivering training programs for DHSEM with consistently excellent participant ratings. Training covers emergency operations, continuity planning, and organizational resilience for state and local government personnel.

Certified Instructor Emergency Management Training Continuity Planning
The right strategy saves more than it costs.

Whether it's technology infrastructure, operational resilience, or emergency preparedness, we help organizations make the next move with confidence.

Schedule a Consultation →